Project context
The current Emeelt infrastructure program publicly identifies a wastewater treatment facility with a first-stage capacity of 6,700 m³/day. The wider industrial development requires coordinated treatment of wastewater from multiple industrial and domestic sources. Khan Taichu’s documented contract scope covers both design transformation/localization and design supervision for the wastewater project.

