Project context
The Emeelt Eco-Industrial Park is being developed as a major industrial zone for processing livestock-derived raw materials. Public project information identifies a 24 MW thermal power plant as one of the park’s core infrastructure components. Khan Taichu’s documented project role covers engineering design transformation/localization and design supervision for the 2×12 MW plant.

