Emeelt Eco-Industrial Park — 2×12 MW Thermal Power Plant

A 24 MW combined heat and power project forming part of the core energy infrastructure planned for the Emeelt Eco-Industrial Park in Ulaanbaatar.

Emeelt Eco-Industrial Park 2×12 MW thermal power plant engineering design
Capacity2 × 12 MW / 24 MW
LocationEmeelt, Ulaanbaatar
SectorEnergy / CHP
Khan Taichu roleLocalization + design supervision
Project overview

Project context

The Emeelt Eco-Industrial Park is being developed as a major industrial zone for processing livestock-derived raw materials. Public project information identifies a 24 MW thermal power plant as one of the park’s core infrastructure components. Khan Taichu’s documented project role covers engineering design transformation/localization and design supervision for the 2×12 MW plant.

Khan Taichu scope

What we contributed

Khan Taichu works between the international design team and the Mongolian project environment. The scope includes transformation of design information for Mongolian use, technical review against current Mongolian construction codes and relevant standards, professional translation of design documentation, coordination of review and approval comments, and design-supervision support. The supervision scope also includes signed supervision outputs and participation in construction-stage technical acceptance and design-change coordination where required by the project.